PE Film for diaper raw material Loading
Date:
1.Before loading. Prepare the goods to be shipped, determine the required container size according to the quantity, volume and weight of the goods, formulate the loading plan, and determine when the trailer will come and when to start loading.
2.Container loading. On the basis of the first draft of the loading program, according to the actual situation of the loading of the container to make adjustments, neatly each other's goods, and in accordance with the requirements of the freight forwarder to take photos of the loading of the container.
3.After loading the container. Organize photos of loading, make cargo manifests, cargo container weight lists.